Content migration

How to plan an enterprise content migration.

The steps, decisions and checks that keep ECM migrations on time and lossless.

Explore content migration capabilities & delivery details
  • 25+ years of delivery
  • 150+ enterprise customers
  • ISO 9001 · ISO 27001 · CMM Level 3
Short answer

A successful enterprise content migration follows five phases: assess the source content and target platform, design the mapping of content types, metadata and security, pilot with representative content, migrate in waves with validation, and reconcile and cut over before retiring the source. Every item should be tracked and verified from export to import.

Why do ECM migrations fail?

Most problems come from underestimating content complexity: inconsistent metadata, custom object types, deep version histories, complex permissions, very large files and content linked to business applications. Weak validation means problems surface only after users go live.

Phase 1: Assess

Inventory repositories, volumes, object types, metadata, versions, renditions, permissions, retention rules and integrations. Identify content that can be archived or deleted instead of migrated, and agree what success means.

Phase 2: Design

Map source types and attributes to the target model, decide how folders, versions, renditions and audit history will be handled, define security mapping and choose a migration approach: big bang, phased by department or content type, or incremental with deltas.

Phase 3: Pilot

Migrate a representative sample, including the hardest content, to verify mappings, measure throughput and test validation and reporting. Adjust the design before scaling.

Phase 4: Migrate in waves

Run migrations in planned waves with delta runs to catch changes made after the initial load. Track every item, log exceptions and resolve them before closing a wave.

Phase 5: Reconcile and cut over

Reconcile counts, checksums and metadata between source and target, obtain business sign-off, switch users to the new platform, set the source to read-only and retire it after the agreed period.

FAQs

Related questions

Short, direct answers to the questions buyers ask most. Need more detail? Ask an expert

How long does a Documentum migration take?

It depends on volume, complexity and cutover constraints. After assessment and a pilot, throughput measurements make it possible to plan waves with realistic timings.

Can audit trails be migrated?

Yes, where the target platform supports importing them. Otherwise audit history can be preserved as linked records or reports for compliance.